mdgrenovations.com
Project Drive

Horseman Residence — Job Book

320 S Gore  •  Soft Start October 2026  •  Full Start November 2026
Last updated: October 8, 2026 at 3:41 PM
Click any product name or image to open
the manufacturer page
MDG Renovations
Horseman Residence — Job Book
320 S Gore  •  Job Book Sections
→
→
→
Whole House
→
→
→
Interior — First Floor 8 Rooms ▸
Interior — Second Floor 9 Rooms ▸
Interior — Third Floor 1 Room ▸
Basement 1 Room ▸
Exterior 4 Rooms ▸
Key Dates
Pulled automatically from our shared "Job Books" Google Calendar — add, edit, or remove an event there and it updates here on its own, no manual entry needed.
Loading key dates…
Client Contact Info
Horseman Family TBD
  • Name: TBD
  • Phone: TBD
  • Email: TBD

Subcontractors, Vendors & Partners
Subcontractors, Vendors & Partners — Whole Job
General ContractorMDG RenovationsTBD
Interior DesignerMcCoy Design StudioTBD
CabinetryTBDTBD
PlumbingTBDTBD
PaintingTBDTBD
ElectricianTBDTBD
TileTBDTBD

Whole House
Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Tile
Tile Spec Sheet
Whole-house tile specification schedule
Tile
Tile Spec Sheet
Tile schedule by location — name, SKU, size, grout color & install notes for Basement Bathroom, Kitchen, Butler's Pantry, Office Bathroom, General (Guest) Bathroom, Primary Suite Bathroom & Laundry Room. Individual tile cards (photos & spec sheets) will be added per room here as selections are finalized.
Preliminary · Received 09/22/2026 · Provided by McCoy Design Studio
Paint
Paint Schedule
Location Brand Color Sheen Notes
Kitchen
CabinetsSherwin-WilliamsHeron Plume SW 6070TBDApproved per 10/08/2026 meeting notes (sent by Amy)
CeilingSherwin-WilliamsSandbar SW 7547TBDApproved per 10/08/2026 meeting notes (sent by Amy)

Interior — First Floor
Foyer / Entry — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — First Floor
Foyer / Entry — Products & Materials
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Interior — First Floor
Dining Room — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — First Floor
Dining Room — Products & Materials
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Interior — First Floor
Front Room / Living Room — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — First Floor
Front Room / Living Room — Products & Materials
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Interior — First Floor
Coffee Bar — Scope of Work
✎
Scope Pending
Located between the formal living room and breakfast area. Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — First Floor
Coffee Bar — Products & Materials
Coffee Bar — cabinetry elevation
Coffee Bar
Cabinetry & Layout Plans
Floor plan & cabinetry elevation — beverage fridge, reeded glass uppers, gallery rail
Received 09/08/2026 · Provided by McCoy Design Studio
Appliances — Dishdrawer (Not Yet Selected)
Fisher & Paykel Series 9 Integrated Tall Double DishDrawer
Coffee Bar — Dishdrawer
Fisher & Paykel — Series 9 Integrated Tall Double DishDrawer™ (DD24DTI9 N)
24" Panel Ready · Integrated
QTY: 1
Option A of 2 — Not Yet Selected
Received 09/02/2026 · Provided by Amy McCoy (McCoy Design Studio)
Fisher & Paykel Series 11 Integrated Tall Double DishDrawer
Coffee Bar — Dishdrawer
Fisher & Paykel — Series 11 Integrated Tall Double DishDrawer™ (DD24DTX6I1)
24" Panel Ready · Integrated · Wi-Fi / SmartHQ™
QTY: 1
Option B of 2 — Not Yet Selected
Received 09/02/2026 · Provided by Amy McCoy (McCoy Design Studio)
Appliances — Undercounter Beverage Center (Not Yet Selected)
KitchenAid 24 inch Panel Ready Beverage Center
Coffee Bar — Beverage Center
KitchenAid — 24" 4.8 Cu. Ft. Panel Ready Beverage Center (KUBL524SPA)
Panel Ready · 2 Temperature Zones · 14 Bottle Capacity
QTY: 2
Option A of 2 — Not Yet Selected. No joiner kit available; allow appropriate clearance if installing side by side.
Received 09/02/2026 · Provided by Amy McCoy (McCoy Design Studio)
Sub-Zero Designer 5.5 Cu Ft Custom Panel Ready Smart Beverage Center
Coffee Bar — Beverage Center
Sub-Zero — Designer 5.5 Cu. Ft. Custom Panel Ready Smart Beverage Center, Right Hinge Glass Panel Door (DEU2450BG/R)
Custom Panel Ready · Right Hinge Glass Door · 8 Bottle Capacity
QTY: 2
Option B of 2 — Not Yet Selected. Hinge location to be verified; no joiner kit included.
Received 09/02/2026 · Provided by Amy McCoy (McCoy Design Studio)
✎
Selections Pending
The design-intent cabinetry plans above show layout only. Dishdrawer and beverage center appliances are narrowed to two options each (shown above) but not yet confirmed — remaining selections (hardware, countertop, finish) have not yet been made with the client and designer either.

Interior — First Floor
Butler's Pantry, Cubbies & Walk-In Pantry — Scope of Work
Butler's Pantry
  • Scope pending TBD
Cubbies
  • Scope pending TBD
Walk-In Pantry Closet
  • Scope pending TBD
Interior — First Floor
Butler's Pantry, Cubbies & Walk-In Pantry — Products & Materials
Butler's Pantry — electrical & lighting plan
Butler's Pantry
Electrical & Lighting Plan (Preliminary)
Birsley pendant over the butler's station & VC Hicks 5" semi-flush fixtures to replace existing cans; storage closet keeps existing lighting
Preliminary · Received 09/09/2026 · Provided by McCoy Design Studio
Butler's Pantry — bar wall cabinetry elevation
Butler's Pantry
Bar Wall Cabinetry Plan
Current vs. proposed bar elevation. The 09/22/2026 sheet adds appliance model numbers (panel-ready fridge/beverage fridge/dishwasher), removes the ice maker & room crown, and adds the brass shelving spec & furniture-base valance. Backsplash tile callout included on both (Olynthos Calacatta, Cremonezia & Smoke Martinique Mosaic, VTS1045MARTINIQ — hatch shown is not representative of the mosaic pattern).
Preliminary · Received 09/08/2026 · Revised 09/22/2026 · Provided by McCoy Design Studio
Butler's Pantry — proposed pantry wall elevation facing the dining room/stairs
Butler's Pantry
Pantry Wall Elevation
Proposed elevation for the pantry wall facing the dining room/stairs — built-in cabinetry wall with hardware callouts. Shown only on this sheet; not carried into the 09/22/2026 bar wall revision.
Preliminary · Received 09/08/2026 · Provided by McCoy Design Studio
Butler's Pantry
  • Selections pending TBD
Cubbies
  • Selections pending TBD
Walk-In Pantry Closet
  • Selections pending TBD

Interior — First Floor
Powder Bath — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — First Floor
Powder Bath — Products & Materials
Powder Bath — cabinetry & floor plan
Powder Bath
Floor Plan & Linen Cabinet Elevation (Preliminary)
Floor plan with sconce placement (53" above counter, 19¾" from right wall) & linen cabinet elevation with open towel shelving
Preliminary · Received 09/08/2026 · Provided by McCoy Design Studio
✎
Selections Pending
The design-intent cabinetry plan above shows layout only — final product selections (fixtures, hardware, finish) have not yet been confirmed with the client and designer.

Interior — First Floor
Kitchen — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — First Floor
Kitchen — Products & Materials
Kitchen — range hood elevation
Kitchen
Range Hood Elevation (Preliminary)
Front & side views — Marazzi Rice Natural 3x8 backsplash tile, Difiniti Ruggetta Echo splash w/ ledge
Preliminary · Received 10/05/2026 · Provided by McCoy Design Studio
Kitchen & Family Room — ceiling & electrical plan
Kitchen
Electrical & Lighting Plan (Preliminary)
Ceiling detail — 5" semi-flush fixtures on the kitchen grid; same sheet also covers the adjoining Family Room (see that section below)
Preliminary · Received 09/09/2026 · Provided by McCoy Design Studio
#E5E1D8
Kitchen Cabinet Paint
SW 6070 Heron Plume
Approved · Meeting notes 10/08/2026 · Sent by Amy Sheen TBD
#CBBFAD
Kitchen Ceiling Paint
SW 7547 Sandbar
Approved · Meeting notes 10/08/2026 · Sent by Amy Sheen TBD
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Interior — First Floor
Family Room — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — First Floor
Family Room — Products & Materials
Kitchen & Family Room — ceiling & electrical plan
Family Room
Electrical & Lighting Plan (Preliminary)
Ceiling detail — Wells Abbott Skiob pendant & Urban Electric living room fixture, with existing speakers & strip lighting retained; same sheet also covers the adjoining Kitchen (see that section above)
Preliminary · Received 09/09/2026 · Provided by McCoy Design Studio
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Interior — Second Floor
General — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — Second Floor
General — Products & Materials
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Interior — Second Floor
Primary Suite Sitting Room — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — Second Floor
Primary Suite Sitting Room — Products & Materials
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Interior — Second Floor
Primary Suite Bathroom — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — Second Floor
Primary Suite Bathroom — Products & Materials
Primary Suite Bathroom — plumbing, fixture & tile plans
Primary Suite Bathroom
Plumbing & Fixture Plans
Floor plan, tub & shower, shower detail & tile layout — heated floors, curbless entry. The 09/22/2026 sheets are linked below (added floor tile pattern, light fixture models & a stone-width note vs. the 09/08 originals; same design, nothing lost).
Received 09/08/2026 · Revised 09/22/2026 · Provided by McCoy Design Studio
Vanity design changed between the two received sets (mirror/sconce treatment & a window) — both linked below until confirmed with McCoy.
Primary Suite Bathroom — before & after floor plan comparison
Primary Suite Bathroom
Floor Plan — Before & After (Preliminary)
Existing layout vs. proposed reconfiguration — curbless shower entry w/ linear drain & bench, freestanding tub, heated floors
Preliminary · Received 08/28/2026 · Provided by McCoy Design Studio
Primary Suite Bathroom — electrical & lighting plan
Primary Suite Bathroom
Electrical & Lighting Plan (Preliminary)
Lighting plan — 4" trimless cans & wet can, 15"W Urban Electric Bowline pendant, Urban Electric sconces, heated floor & heated towel warmer
Preliminary · Received 09/09/2026 · Provided by McCoy Design Studio
✎
Selections Pending
The design-intent plumbing, fixture & electrical plans above show layout only — final product selections (brand, model, finish) have not yet been confirmed with the client and designer.

Interior — Second Floor
Primary Suite Laundry Room — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — Second Floor
Primary Suite Laundry Room — Products & Materials
Primary Suite Laundry Room — plan & elevations
Primary Suite Laundry Room
Cabinetry & Layout Plan
Floor plan & cabinetry elevations — washer/dryer wall, sink wall, retractable pocket doors. Floor plan includes the floor tile layout callout (diagonal checkerboard pattern). The 09/22/2026 sheet (linked below) is a minor layout cleanup of the same design received 09/08/2026.
Received 09/08/2026 · Revised 09/22/2026 · Provided by McCoy Design Studio
Note: this sheet's floor plan labels the floor tile "Zia Tile Etna in Carrara and Grigio Carnico" — the Tile Spec Sheet lists it as "Zia Tile Piazza in Carrara + Grigio Carnico." Same colorway, different pattern name; confirming with McCoy before finalizing.
Primary Suite Laundry Room — electrical & lighting plan
Primary Suite Laundry Room
Electrical & Lighting Plan (Preliminary)
Lighting plan ("Laundry Room — After") — 5" semi-flush & pendant fixtures over the folding counter, shown with sink, washer/dryer & cabinetry layout
Preliminary · Received 09/09/2026 · Provided by McCoy Design Studio
✎
Selections Pending
The design-intent cabinetry & electrical plans above show layout only — final product selections (appliances, hardware, countertop, finish) have not yet been confirmed with the client and designer.

Interior — Second Floor
Primary Suite Closet / Dressing Room — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — Second Floor
Primary Suite Closet / Dressing Room — Products & Materials
Dressing Room — cabinetry plan & elevations
Primary Suite Closet / Dressing Room
Cabinetry Plan & Elevations (Preliminary)
Floor plan & built-in cabinetry elevations — flanking drawer towers, built-in mirror & metal grille door inserts
Preliminary · Received 09/08/2026 · Provided by McCoy Design Studio
✎
Selections Pending
The design-intent cabinetry plan above shows layout only — final product selections (hardware, finish, mirror glass) have not yet been confirmed with the client and designer.

Interior — Second Floor
Girls' Room — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — Second Floor
Girls' Room — Products & Materials
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Interior — Second Floor
Office — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — Second Floor
Office — Products & Materials
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Interior — Second Floor
Office Bathroom — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — Second Floor
Office Bathroom — Products & Materials
Office Bathroom — plumbing, fixture & tile plans
Office Bathroom
Plumbing & Fixture Plans
Bathtub & shower, tile layout & vanity elevations — curbless entry. The 09/22/2026 sheets are linked below (corrected tile spec PF-36XX→PF-36, added fixture models; same design, nothing lost).
Received 09/08/2026 · Revised 09/22/2026 · Provided by McCoy Design Studio
Floor plan design changed between the two received sets — the 9/22 sheet adds heated floor & tile fill but drops the soffit height, casing width & window-height notes shown on the 9/8 sheet. Both linked below.
Office Bathroom — before & after floor plan comparison
Office Bathroom
Floor Plan — Before & After (Preliminary)
Existing layout (double vanity) vs. proposed reconfiguration — single vanity & revised tub/shower wall
Preliminary · Received 08/28/2026 · Provided by McCoy Design Studio
Office Bathroom — electrical & lighting plan
Office Bathroom
Electrical & Lighting Plan (Preliminary)
Lighting plan — 5" wet can, RL 4461NB-WG sconce, Urban Electric Disc 24"W fixture, exhaust fan & heated floor
Preliminary · Received 09/09/2026 · Provided by McCoy Design Studio
✎
Selections Pending
The design-intent plumbing, fixture & electrical plans above show layout only — final product selections (brand, model, finish) have not yet been confirmed with the client and designer.

Interior — Second Floor
General Bathroom — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — Second Floor
General Bathroom — Products & Materials
General Bathroom — plumbing, tile & elevation plans
General Bathroom
Plumbing, Tile & Elevation Plans
Floor plan, tile layout & vanity elevation — keeping existing plumbing fixtures. Revised 09/22/2026 consolidates the floor plan, vanity & shower elevations with electrical/lighting callouts (5" wet can, exhaust fan) onto one sheet, and includes tile callouts (Clé Lapidary Pantry Pavers Shale Hex floor; Pratt & Larson PF-36/PF-33 field tile; HR-HRC1 trim).
Labeled "Guest Bath" on the McCoy plans.
Received 09/08/2026 · Revised 09/22/2026 · Provided by McCoy Design Studio
Note: the revised sheet labels the HR-HRC1 trim as 3/4"x6" — the Tile Spec Sheet lists Guest Bathroom's HR-HRC1 trim as 1/2"x6". Confirming with McCoy before finalizing.
General Bathroom — electrical & lighting plan
General Bathroom
Electrical & Lighting Plan (Preliminary)
Lighting plan ("Guest Bath") — VC Hulton sconce, VC Perry semi-flush, wet can at the tub & exhaust fan
Preliminary · Received 09/09/2026 · Provided by McCoy Design Studio
✎
Selections Pending
The design-intent plumbing, fixture & electrical plans above show layout only — final product selections (brand, model, finish) have not yet been confirmed with the client and designer.

Interior — Third Floor
General Bathroom — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Interior — Third Floor
General Bathroom — Products & Materials
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Basement
Bathroom — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Basement
Bathroom — Products & Materials
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Exterior
Siding — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Exterior
Siding — Products & Materials
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Exterior
Porch — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Exterior
Porch — Products & Materials
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Exterior
Egress Access — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Exterior
Egress Access — Products & Materials
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.

Exterior
General — Scope of Work
✎
Scope Pending
Scope of work for this space has not yet been finalized. Add demo, rough-in, and finish tasks here once confirmed with the client and designer.
Exterior
General — Products & Materials
✎
Selections Pending
Product and material selections for this space have not yet been made. Add fixtures, finishes, and cut sheets here once confirmed with the client and designer.
Jump to Section
Project Drive Key Dates Client Contact Info Subcontractors, Vendors & Partners
Whole House
Whole House Tile Paint Schedule
Interior — First Floor
Foyer / Entry Dining Room Front Room / Living Room Coffee Bar Butler's Pantry, Cubbies & Walk-In Pantry Powder Bath Kitchen Family Room
Interior — Second Floor
General Primary Suite Sitting Room Primary Suite Bathroom Primary Suite Laundry Room Primary Suite Closet / Dressing Room Girls' Room Office Office Bathroom General Bathroom
Interior — Third Floor
General Bathroom
Basement
Bathroom
Exterior
Siding Porch Egress Access General